Traversing the cities of Pevely, Herculaneum, Festus, and Crystal City, Missouri, this project addresses traffic and safety concerns along the I-55 corridor and helps leaders prepare for future development and growth patterns in the region. I-55 is one of the heaviest traveled interstates in Missouri, with over 70,000 daily motorists and nearly 11,000 heavy trucks.

No items found.

PROJECT DETAILS:

Client

MoDOT

Location

St. Louis, Missouri

Project Manager

Matt Spencer

2023

As part of a larger team, Hg Consult is providing engineering, roadway design, structural design, stormwater design, and traffic services for this project which will include an additional lane on I-55 in both directions from Route Z to US 67; a grade separated interchange to replacing the existing US 67 and Route CC interchange; new interchanges at Route Z, McNutt, and US 67/I-55; new lanes at the SB I-55 to SB US 67 ramp and the NB 67 to NB I-55 ramp; 14 new bridges; and 12 rehabilitated bridges.